How to Object to a Planning Application on Loss of Light

Loss of daylight and sunlight is a material planning consideration, which means the council has to weigh it. An objection that gives the officer measurements and the right references carries weight; one that says the extension is too big does not. This guide explains what to say, what to leave out and includes a template letter.

What the council can take into account

A planning officer decides an application on material planning considerations. Loss of daylight and sunlight to neighbouring homes is one. So are overshadowing of gardens, loss of outlook and a sense of enclosure. Loss of a view, loss of property value, the neighbour’s motives and your private right to light are not. An objection built on the first group is read; an objection built on the second is noted and set aside. Our guide to the daylight and sunlight tests explains the measurements the officer will have in mind.

Timing

The letter from the council gives the deadline for comments, normally 21 days from the date of the notice. Late comments are often still read if they arrive before the decision, but do not rely on it. Check the planning portal for the target decision date and, for a larger scheme, whether it is going to committee, where you may be able to speak.

What to put in the objection

  1. Which window and which room. Name the room, say which floor it is on and say whether it has any other window. A kitchen or living room with a single window beside the proposal is the strongest case.
  2. The geometry. How far the extension projects past your rear wall, how high it is at the boundary and how far it is from your window. Take the figures from the drawings on the portal.
  3. The 45 degree rule for an extension beside your window, or the 25 degree rule for a building opposite it. Say whether the line is crossed; the officer will check.
  4. Sunlight, if your window faces within 90 degrees of south and the proposal sits between it and the sun.
  5. A request that a daylight and sunlight assessment is required before the application is decided, if none has been submitted.
  6. A measured report of your own, where the scheme is large enough to justify it. A short report from a surveyor acting for you, showing the vertical sky component before and after, is the single most effective thing an objector can submit.

What to leave out

Do not argue your right to light in a planning objection. The officer cannot consider it and the applicant’s advisers will read the objection. Mention it only in a closing line reserving your position, as the template does. Do not estimate the loss in percentages unless you have figures from a surveyor; an officer who finds one number wrong discounts the rest. Keep the tone flat. The officer is not the applicant.

A report from your own surveyor

For an extension the geometry and the 45 degree rule are usually enough. For a two storey rear extension, a new house in a garden or a block of flats, the applicant will often have submitted a daylight report of their own, written to show the scheme in the best light. A report commissioned by you, running the same BRE tests on your windows, lets the officer see where the two disagree and is written for you rather than for the applicant. We prepare these for objectors and quote from the drawings within a working day.

Template objection letter

Replace the bracketed text. Keep what applies and delete what does not. Send it through the planning portal or by email to the case officer, quoting the reference.

Template objection: loss of daylight and sunlight

To: The Planning Officer, [Council name]
Application reference: [reference]
Site: [address of the application site]
From: [your name], owner and occupier of [your address]

I object to this application on the grounds of loss of daylight and sunlight to my home.

1. My property adjoins the application site. The [rear / side] window of my [kitchen / living room / bedroom] at [ground / first] floor faces the proposed [extension / building] and is approximately [distance] metres from it.

2. The proposed [extension / building] projects [depth] metres beyond my rear wall and rises to approximately [height] metres at the boundary. Drawn from the centre of my window, it crosses the 45 degree line [in plan and in elevation], which the BRE guide Site Layout Planning for Daylight and Sunlight and the council's own design guidance identify as a likely cause of a noticeable loss of daylight.

3. The window is the only source of daylight to the room, which is in daily use. [If relevant: the window faces within 90 degrees of south and the room currently receives direct sunlight in the [morning / afternoon], which the proposal will remove.]

4. No daylight and sunlight assessment has been submitted with the application. I ask that the council requires one, carried out to the BRE guide, before the application is determined, so that the effect on my window can be properly measured against the vertical sky component and sunlight hours tests.

5. [If you have one: I attach a daylight and sunlight report prepared on my behalf by [surveyor], which shows that the vertical sky component to my [room] window falls from [x] per cent to [y] per cent, a ratio of [z], below the 0.8 ratio in the BRE guide.]

I ask that the application is refused, or that it is amended by [reducing the depth to [x] metres / lowering the height at the boundary / hipping the roof] so that my window is no longer affected.

This objection concerns the planning merits of the application. It is made without prejudice to my private right to light, which is not affected by any planning decision.

[Your name]
[Date]

After the decision

If the application is refused, the applicant can appeal and you will be told; your objection goes to the inspector. If it is approved, the planning route is over, but your private right to light is untouched. If your window has been there for twenty years and the scheme takes a serious amount of light from the room, that is the point to have the rights of light position checked. Our guide to a neighbour’s extension blocking your light sets out the next steps.

If you are facing a scheme next door, send us the drawings or the planning reference. We will tell you within a working day whether your windows look affected and what the sensible next step is. The first conversation is free and there is no obligation to go further.

Frequently asked questions

5

Is loss of light a valid planning objection?

Yes. Loss of daylight and sunlight to neighbouring homes is a material planning consideration in every local plan and the council must weigh it.

5

Can I object on right to light grounds?

Not at planning. A right to light is a private matter the council cannot consider. Object on daylight and sunlight instead and reserve your right to light in a closing line.

5

Will my objection stop the extension?

It may lead to refusal or to changes, especially where the 45 degree line is clearly crossed. Where the loss is marginal the council may approve anyway, which is why a measured report helps.

5

Can I see the applicant's daylight report?

Yes. If one has been submitted it is on the planning portal with the application documents. If none has been, ask the officer to require one.

5

Do I need a surveyor to object?

Not for a simple extension. For larger schemes, or where the applicant has their own report, a short report from your own surveyor is the most effective evidence you can give the officer.

Get in Touch

We will be in touch to discuss your situation within one working day, free of charge.

    *Note - We will not share your personal details with any third parties, and you will not receive any email communication from us outside of direct correspondence in relation to your enquiry.

    Our Location

    Blue Sky Surveyors
    Office 7, 35-37 Ludgate Hill
    London
    EC4M 7JN

    Contact Information

    Phone: +020 7867 3955
    Email: info@rightsoflightsurveyors.co.uk

    How to Object to a Planning Application on Loss of Light